Change font size: A A A
Print this page

Wild Meadows Wind Farm

Contact

Please contact Project Developer Ed Cherian with any questions on the project: 603-440-3127, echerian@iberdrolaren.com.

Back to Wild Meadows Wind Farm Home

In an effort to be as transparent as possible, below is a list of documents we had previously posted that reflect the preliminary, conceptual design of the project. The final design that will be going through the NHSEC permitting process has been improved since this earlier version.


November 2012 Public Open House Materials
Wild Meadows Wind Farm Fact Sheet pdf icon 248 KB
Proposed Project Layout at Wild Meadows Wind Farm (as of October 2, 2012) pdf icon 4.7 MB
Public Involvement and Input pdf icon 204 KB
Wind Energy and the Environment pdf icon 192 KB
National Historic Preservation Act Section 106 Process pdf icon 156 KB
Above Ground Survey of Previously Recorded Cultural Resources Map pdf icon 3.4 MB
National Historic Preservation Act Section 106 Process Handout pdf icon 1.2 MB
Predicted Sound Contours for Wild Meadows Wind Farm (as of October 2, 2012) pdf icon 7 MB
How Wind Energy Works pdf icon 194 KB
Common Indoor and Outdoor Sound Levels pdf icon 23 KB